Date: June 29, 2024
We have lots of new equipment arriving and we need help getting the gym ready. Gym maintenance will take place starting June 23 at 10am and will continue throughout the week until everything is complete.
There are a number of small tasks that need to be completed as well. These can be done at anytime between June 23 and July 5. Please let Keira know when you will be come to ensure the building will be open.
Task | Details | Tools Required | Date/Time |
Move equipment | move all mats, beams, blocks, etc. | muscles | COMPLETED |
Fix sprung floor | take floor apart, repair, put back together | drill, hammer, gloves | COMPLETED |
Remove old trampoline | remove springs, bed & frame, clean cement pit | gloves, socket wrench | COMPLETED |
Clean foam pit | Remove foam, replace hooks, vacuum, repair net, dispose of damaged form | mask, shop vacuum | COMPLETED |
Reset and clean gym | vacuum all the carpets, wipe down all the mats, put back all equipment | gloves, vacuum | Saturday, June 29 at 10am |
Install plaques & photos | put up original building sponsor plaques. Move year end plaques to comp wall. Hang team photos | drill | Anytime between June 23 & July 5 |
Hang fire department sign in gym | drill | COMPLETED | |
Fix toilet | tighten bolts | wrench | Anytime between June 23 & July 5 |
Under stage doors | remove, cut, and replace doors on gym side so that they will open | saw, screw driver | Anytime between June 23 & July 5 |
Low beam | build and install low beam feet | saw, drill, hammer, wood | Anytime between June 23 & July 5 |
Deep clean bathrooms | scrub walls, floor, sink, toilet | supplies provided | Anytime between June 23 & July 5 |
Clean tables & chairs | scrub all the tables & blue chairs | supplies provided | COMPLETED |
Clean foam pit wall | scrap & scrub white stuff off wall | supplies provided | Anytime between June 23 & July 5 |
Clean outside wall | pressure wash outside walls in preparation for painting | pressure washer | Anytime between June 23 & July 5 |
Paint outside walls | paint a section with chalkboard paint and repaint grey | ladder | Anytime between June 23 & July 5 |